August 24, 2007
Elevator shaft now 8 stories high (of 14). Progress is moving rapidly with construction teams working 16-24 hour days. Part of the roof has been installed over the basement which will house the new Department of Therapeutic Radiology.
May 29, 2007
Significant progress as of 5/29/07. Note 5 bays for linear accelerators and gamma knife unit. Orthovoltage and high dose rate unit will be in 2 additional bay areas to the left of LINAC bays not in photo.
March 23, 2007
View of the construction of the Department of Therapeutic Radiology. The department will span this entire level and includes 4 linear accelerator bays, a gamma knife bay, separate areas for CT-simulator, PET-CT simulator, HDR facility, orthovoltage, clinic area, dosimetry, conference space, multidisciplinary examination area, procedure rooms, and office space. This is the lower level of the 14-story Cancer Center at Yale which will also include multidisciplinary clinical space, 112 in-patient oncology beds, operating rooms, and a roof terrace garden.
The department will continue to maintain all basic research laboratory operations in the newly renovated second and third floors of the Hunter building, and will continue to utilize portions of the current department for specific conferences, and a subset of administrative operations.